InfoCritical Risk Controls


In this page:

Table of Contents

Related pages:

Child pages (Children Display)
pageRisk User Guide

CRITICAL RISK CONTROLS

Info

Critical risk controls can be added as items in a list to be selected rather than free text. This allows for consistency across the business and can be attached to any / multiple risks. When attached to the master risks, it will advise project managers of the specific controls that are required to be in place. 

This use of critical risk controls within Lucidity is an optional feature that will suit large to enterprise businesses only. Please discuss with Lucidity to access this feature.

Tip

Video: Critical Risk Controls Overview


Critical Risk Control Settings

In order to utilise the critical risk controls feature, several specific managed lists need to be configured first. These are found in the Settings tab and are typically only accessible by system administrators. Refer to Risk Settings for general settings information.

Hierarchy of Controls

Apply the highest level of relevant controls from the hierarchy to a critical risk control

Control Categories

Apply categories to controls

Unwanted Scenarios

Create standard unwanted scenarios to be used in multiple controls

Control Effectiveness

Apply the effectiveness of the control

Add a Master Risk Control

Tip

Video: Add Master Risk Control

VIDEO COMING SOON

To add a master risk control, from the Master Register > Master Risk Controls menu:

  1. Click 'Add New'

    Image Modified

  2. Complete the fields (see table 'Definitions of Fields' below) 

The details captured for each record may vary slightly between each system configuration. Fields marked with * are mandatory.

Image Modified

Description of Fields

Field

Description

Control ID

Enter the internal ID reference (used in reporting)

Example: HSE.WH.01

Critical control

Tick if critical control (ie - if this control is not in place there is a risk of death)

Hierarchy of control

Select the highest relevant hierarchy of control 

Control category

Select the control category (used in report filtering)

What is the control?

Enter specifics on the control required to be put in place

What is the unwanted scenario?

Enter the possible unwanted scenario aiming to be prevented

What is the specific objective of this critical control?

Enter the control objective

What could cause this control to fail or lessen its effectiveness over time (escalation factors)?

Enter relevant factors

Specify the performance required of this critical control to ensure it meets its objective (e.g. design specification)?

Specify performance criteria

What are the actions or tasks that need to be completed by frontline operators or maintainers to ensure each performance requirement is being achieved?

Enter required actions or tasks (Lucidity InForm may be utilised here)

What checking is required by supervisors to ensure the critical control is implemented as specified?

Enter checks required by supervisors (Lucidity InForm may be utilised here)

What checking is required by management to verify supervisors are doing their checks in a timely manner and to a high standard, escalation factors are not being triggered and critical controls are effective and functioning as required?

Enter checks required by management (Lucidity InForm may be utilised here)

Legislative reference

Enter any relevant references to national, state or local legislative requirements

Using Critical Risk Controls in Master Risks

Tip

Video: Using Critical Risk Controls in Master Risks

VIDEO COMING SOON

To utilise critical risk controls in a master risk, from the master register page:

  1. Use filters as required to locate the relevant master risk

    1. Note critical risk controls can be added to new risks. Refer to the Master Register page in the user guide for more information.

  2. Click 'Edit' the far right of the relevant master risk

  3. In addition to the standard fields in master risks, 2 additional sections are available:

    1. Critical Risk Controls - critical risk controls that must be implemented to avoid the likelihood of death

    2. Standard Risk Controls - other controls to be implemented 

  4. To add a critical or standard risk control, click 'Add' in the relevant section

    Image Modified

  5. Select the controls to add from the drop down list

  6. Click 'Done'

    Image Modified

    1. Note risk controls can be deleted by clicking 'Delete' to the far right of the control

  7. Complete any additional information required in the master risk

  8. Click 'Save.

Using Critical Risk Controls in Project Risk Registers

Tip

Video: Using Critical Risk Controls in Project Risk Registers

VIDEO COMING SOON

Critical risks form part of the project risk registers and are added by:

  1. Ensure the master risk is added to the relevant risk templates - refer the Risk Templates user guide

  2. Add templates to project risk registers - refer to the Risk Register user guide

    1. Project managers can add, edit and delete critical risk controls from individual project risks in the same way any risk field can be edited in the project register. This has no impact on risk templates.

Once created, project managers are responsible for reviewing each individual risk within their project and editing as relevant, including updating the critical risk control.

To updated the critical risk control, from the Risk Register page:

  1. Use filters to locate the relevant project risk register

  2. Click 'Risks' to the far right hand side

  3. Edit each risk and, in addition to the standard requirements outlined in the Risk Register user guide:

    1. Click 'Edit' on the risk control to be reviewed

    2. Repeat for each critical and standard risk control

    3. Complete the fields (see table 'Definitions of Fields' below 

      1. The details captured for each record may vary slightly between each system configuration. Fields marked with * are mandatory.

    4. Click 'Save'

    5. Add any additional risk controls not already included relevant for the individual project

    6. Delete any risk controls not relevant for the individual project

Image Modified

Definition of Fields

Note some fields may be pre-populated from the master critical risk control

Field

Description

Critical Risk Control

This will be pre-populated and non-editable. 

Control Description

Enter the control description

Control Owner

Nominate the control owner (note owner must be listed within the system)

Local, legal, regulatory and contractual requirements

Enter any requirements

Control effectiveness

Select the control effectiveness